· SAC2200 all terrain crane uses the seself-assembly and disassembly of the main and auxiliary winches, which reduce the traveling weight of the whole machine, thus improving efficiency and reducing fuel consumption.
· Powerful Lifting Capacity
·The 220 ton crane is equipped with seven section U-shaped booms made of fine-grain high-strength steel plate; the longest boom length is 103m, lifting height of 103.5m, max.lifting capacity of 220t;
· 0°~ 40°automatical infinite variable luffing jib is applied to ensure convenient switch over between all operating conditions with high efficiency.
· Efficient Hydraulic System
·Self-developed dual-pump converging/diversion main valve is used. Converging flow of the single-action dual-pump can be up to 520L/min, ensure fast and efficient operation. Combined-action dual-pump diversion system is applied to ensure stable controllability with independent oil supply.
·Electric proportional variable displacement piston pump is used to ensure high-accurate flow control which is efficient and energy saving.
· Excellent & Stable Chassis
·The use of innovative 5-axle chassis design and multiple braking modes provide more reliable traveling performance. With tipping early-warning technology, high stable overall operation and high safety can be achieved.
· Intelligent Electronic Control
·The adoption of internationally advanced distributed integration bus data communication network and the configuration of abundant sensing elements can achieve timely feedback of data information and monitor the overall working status in real-time. The human-computer interaction interface is used to meet customer's individual requirements.
· Various Safe Devices
·The crane's cab is made of safety glass and anti-corrosion steel plate with ergonomic design, the voice alarm, anti-rollover function and ABS are applied.
· Lifting Expert System
·The system could guide and provide lifting plan or select the best lifting plan which could ensure the stability and safety of the construction.
Capacity |
Max. lifting capacity |
220t |
Dimensions |
Overall length |
15530 mm |
Overall width |
3000mm |
|
Overall height |
4000mm |
|
Axles |
5 |
|
Axle distance-1,2 |
2750 mm |
|
Axle distance-2,3 |
1650 mm |
|
Axle distance-3,4 |
2490 mm |
|
Axle distance -4, 5 |
1650 mm |
|
Weight |
Overall weight |
60000 kg |
Front axle load |
12000 kg |
|
Rear axle load |
12000 kg |
|
Engine |
Model |
BENZ |
Rated power |
390 kW/1800 rpm |
|
Rated torque |
2400 N.m/ 1100 rpm |
|
Emission standard |
Euro Ⅲ |
|
Traveling |
Max. traveling speed |
81 km/h |
Min.turning radius |
10m |
|
Min.turning radius of boom head |
11m |
|
Drive train |
10 × 8 |
|
Min. ground clearance |
325mm |
|
Approach angle |
20° |
|
Departure angle |
17° |
|
|
|
|
Max. gradeability |
58% |
|
Fuel consumption per 100km |
≤ 72 L |
|
Main Performance |
Temperature range |
– 20 ℃ ~ + 40 ℃ |
Min.lifting radius |
3m |
|
Tail swing radius of superstructure |
4.85 m |
|
Boom section |
6 |
|
Boom shape |
U-shaped |
|
Max. lifting moment-Base boom |
7271 kN·m |
|
Max. lifting moment-Full-extend boom |
3540 kN·m |
|
Max. lifting moment-Full-extend boom+jib |
952 kN·m |
|
Length-Base boom |
13.5 m |
|
Length-Full-extend boom |
62 m |
|
Length-Full-extend boom+jib |
103.5 m |
|
Outrigger span(Longitudinal/Transversal) |
9.0 × 8.5 m |
|
Jib offset |
0°~40° |
|
Working Speed |
Max. single rope lifting speed of main winch(no load) |
130 m/min |
Max. single rope lifting speed of auxiliary winch(no load) |
130 m/min |
|
Full extend/retract time of boom |
550 / 550 s |
|
Full raise/lower time of boom |
60 / 90 s |
|
Swing speed |
1.8 r/min |
|
Aircondition |
HVAC in up cab |
Cooling and Heating |
|
HVAC in low cab |
Cooling and Heating |