
2. The main electrical control components use imported components to increase life and reliability, the control system has a high degree of automation, which facilitates the operation of the tower crane and the real-time understanding of the tower crane's various operating data, providing the driver with safe, reliable and simple operation.
3. The configuration has high-quality safety devices with high reliability and high precision ensures the safe operation of the tower crane.
Tower Crane XCP330HG(7525-16) |
|||||
|
Model |
Speed |
Hoist Weight(t) |
Rope Capacity |
Power(kW) |
Hoisting |
75JLF40 |
0-90 |
2.0 |
804m>804m* |
75 |
0-60 |
4.0 |
||||
0-45 |
8.0 |
||||
0-45 |
4.0 |
||||
0-30 |
8.0 |
||||
0-22.5 |
16.0 |
||||
Trolleying |
7.5JXF8C |
0-65m/min |
7.5 |
||
Slewing |
11RVF |
0-0.7r/min |
2*9 |
||
Travelling |
RT |
0-25m/min |
4*4 |
||
Main Supply ~380(±10%)50Hz |
|||||
Gross Power(Excuding climbing and travelling) 100.5kW |
