
2. Use a large number of high-level connectors for fault diagnosis and maintenance.
3. The configuration of high-quality safety devices with high reliability and high precision ensures the safe operation of the tower crane.
4. Four connection sleeves below the basic section. When the tower crane is in working and non-working conditions, the tower body has high strength and good stability.
XGT63YD(5013-5) |
|||||
|
Model |
Speed |
Hoist Weight(t) |
Rope Capacity |
Power(kW) |
Hoisting |
18QT13TⅡ |
9 |
2.5 |
345m>345m* |
18/18/5 |
35 |
2.5 |
||||
70 |
1.25 |
||||
4.5 |
5.0 |
||||
17.5 |
5.0 |
||||
35.5 |
2.5 |
||||
Trolleying |
24BDZ50Ⅱ |
40/20m/min |
2.4/1.5 |
||
Slewing |
50HR120 |
0-0.6r/min |
5.5 |
||
Travelling |
RT |
0-24m/min |
2*5.2 |
||
Main Supply ~380(±10%)50Hz |
|||||
Gross Power(Excuding climbing and travelling) 25.9kW |