
2. The main electrical control components use imported components to increase life and reliability, the control system has a high degree of automation, which facilitates the operation of the tower crane and the real-time understanding of the tower crane's various operating data, providing the driver with safe, reliable and simple operation.
3. The configuration has high-quality safety devices with high reliability and high precision ensures the safe operation of the tower crane.
4. The tower body is a standard piece section, which is convenient for transportation and high interchangeability, the boom has a combination of
Tower Crane XGT7530-20 |
|||||
|
Model |
Speed |
Hoist Weight(t) |
Rope Capacity |
Power(kW) |
Hoisting |
90JLF50Z |
0-90 |
2.5 |
610m>610m* |
90 |
0-65 |
5.0 |
||||
0-45 |
10.0 |
||||
0-45 |
5.0 |
||||
0-32.5 |
10.0 |
||||
0-22.5 |
20.0 |
||||
Trolleying |
11JXF10 |
0-65m/min |
11 |
||
Slewing |
145HL120 |
0-0.7r/min |
2*9 |
||
Travelling |
RT |
0-25m/min |
4*5.2 |
||
Main Supply ~380(±10%)50Hz |
|||||
Gross Power(Excuding climbing and travelling) 119kW |
